Oak Park · River Forest · Chicago's near-west side

Built on the level.

Design-build remodels · kitchens, baths, additions, basements

One contract from first sketch to final walkthrough. Straight lines, honest numbers, and a schedule you can set your life by — because you shouldn't have to move out twice for one renovation.

A newly framed second-story addition rising above the roofline of an older Chicago home at golden hour

Sheet

A-101 · Rear Addition

Area

640 sq ft

Calendar

26 weeks

Licensed, bonded & insuredOne contract, design to walkthrough2-yr workmanship warranty94% finished on the promised week
A finished rear addition on a Chicago foursquare, new siding and windows matched to the century-old house
21'-4" × 14'-0" · added to a 1908 foursquare

0+

years building on the near-west side

0+

permits pulled and closed clean

0%

of jobs finished on the promised week

0-yr

workmanship warranty, in writing

Before & after

The wall came down. The house stood up straighter.

A closed-off galley that forced the homeowners to choose between cooking and company. We took the rear wall down to the foundation, dropped a steel beam the inspector called 'textbook', and gave the room the south light it had been owed for a hundred years.

Drag the handle — it works.

See all three projects
The Kenilworth Kitchen — Gut remodel, rear wall opened, new island — afterBeforeAfter

How a job runs

Six phases, drawn before they're built.

PH-01

Measure & Design

We laser-measure the house as it is, not as the 1911 drawing says it is. You get plans, a materials budget, and a range you can take to your lender.

PH-02

Drawings & Permits

Engineered drawings, village review, historic-district packets when needed. We answer the reviewer's questions before they're asked.

PH-03

Demo & Structural

Protected floors, negative-air dust walls, and dumpsters that leave the driveway on schedule. Steel goes in; laser levels tell us the old walls what to do.

PH-04

Rough-In

Plumbing, electrical, and HVAC — the veins of the house — inspected twice because the second look is cheaper than the first mistake.

PH-05

Finishes

Cabinets set to a string line, tile laid from drawings, trim coped by hand. This is the phase you'll photograph; we build it that way.

PH-06

Walkthrough & Warranty

A punch list walked with a tape measure and a flashlight, signed off in writing. Two-year workmanship warranty, transferable when you sell.

Word of mouth

They found things behind the walls that would have terrified another contractor and just... told us what they cost to fix, in a spreadsheet, the same day. We stopped bracing for surprises.
Dana & Priya R. · Oak Park
The schedule said week seven for cabinets. The cabinets came in week seven. I have renovated before, so I understand how remarkable that sentence is.
Marcus T. · Forest Park

Straight lines. Honest numbers.

Start with the Build Planner to see a range and a schedule — then we'll verify both in your basement, with a tape measure, for free.